Light Weight European Style Bridge Crane Brief Introduction:
European style bridge crane is designed with a unique concept. And it has the characteristics of small size, light weight and light wheel pressure.
Compared with traditional bridge crane, the distance between the hook of European style bridge crane to the wall has a minimum data, and it has the lowest headroom. The European style bridge crane could do a better job closing to front of lifting work. With a higher lifting height, European style bridge crane highly improves the efficiency of work space.
Appliance of European style bridge crane:
The European style bridge crane could be widely used in : Metallurgy, mining, construction, transportation, chemical industry, energy, machinery manufacturing, light industry, pharmaceutical, textile and other fields of traffic, the assembly line, material handling system of mobile power supply and control system, such as: steel mills, shipyards, automobile factory, railway, airport, port, station wharf, warehouse, loading bays, Bridges, subway, light rail, home appliance manufacturing, paper making, sugar, wine industry, power plants, chemical plants, waterworks, and playground etc.
Guarantee and After Service of European style bridge crane:
1. General term for whole crane is 1 year guarantee, and for special project can be negotiated.
2. We can provide some quick wear spare parts for free.
3. Free technical guide through internet, and if necessary can arrange engineer go to customer’s side.
4. Installation service is available.
Light Weight European Style Bridge Crane Advantages:
1. The height is small to reduce the height of the crane factory.
2. Light weight to reduce the plant capacity.
3. The limit is small, and it can increase crane operation space.
4. The reducer adopts machine of decelerate of hard tooth flank,
and it could effectively improve the service life of European style
bridge crane.
5. The whole process is produced by machining equipment.
The structure shall be smaller and the precision of assemble shall be higher.
6. The main girder uses the high strength bolt connection between each other.
7. The reducer, drum, coupling and other parts of the
European style bridge crane are free maintenance in one year.