Volumes (m³) |
Proportion of materials (t/ m³) |
Capturing the materials (t) |
Opening /closing time(s) |
Self-weight of the grab (t) |
Suggestion of the equiped crane |
1 |
>1.8-1.9 |
1.8-1.9 |
14 |
2.085 |
5T |
1.5 |
>1-1.8 |
1.5-2.1 |
12.5 |
2.235 |
5T |
2.5 |
>0.5-1 |
1.25-2.5 |
8 |
2.285 |
5T |
2 |
>1-1.2 |
2-2.4 |
12 |
2.5 |
5T |
2.5 |
0.86 |
2.15 |
10.3 |
2.83 |
5T |
0.5 |
>1.7-2.5 |
0.85-1.25 |
9.5 |
2.05 |
5T |
0.5 |
>2.5-4 |
1.25-2 |
10 |
2.35 |
5T |
1 |
>1.8-1.9 |
1.8-1.9 |
12.22 |
2.524 |
5T |
1.5 |
>1-1.2 |
1.5-1.8 |
13 |
2.35 |
5T |
2.5 |
>0.6-1.0 |
1.5-2.5 |
10.3 |
2.493 |
5T |
2 |
>1.8-2.9 |
3.6-5.8 |
15 |
3.898 |
10T |
3 |
>1-1.8 |
3-5.4 |
15 |
4.4 |
10T |
5 |
>0.5-1 |
2.5-5 |
10 |
4.62 |
10T |