500-Ton "Henan Mine" Crane Supports World-Class Wind Power Project Construction

2024-01-08


 

At the site of a world-class offshore wind power project, a 500-ton double-trolley, double-girder crane manufactured by Henan Mine Crane has been installed and put into operation, becoming another high-quality crane following the 400-ton crane for the nuclear power project.

It is reported that the company manufactured 43 sets of new crane products for the first phase of the project, providing significant equipment and technical support for my country's construction of a world-class offshore wind power energy cluster.




● Energy Saving and Consumption Reduction

The lifting mechanism features a lightweight design, high lifting head, and automatic speed adjustment, effectively saving energy consumption in heavy workshops.

High-Precision Positioning and Anti-Sway Control

Multiple hooks with high-precision synchronization and an electronically controlled anti-sway function provide convenience for the efficient handling of heavy workpieces.

Safety Assurance

Advanced digital and video monitoring and protection functions, and full lifecycle management provide comprehensive safety assurance for equipment operation and work sites.

Henan Mine Crane will continue to deepen its involvement in the national wind power industry, increase investment in new product research and development, empower China's wind power with high-quality intelligent manufacturing, and contribute to achieving the national goals of carbon peaking and carbon neutrality.